Al-Mahmodiyah Waste Water Treatment Project
Al-Mahmodiyah Waste Water Treatment Project
Client: Ministry of Municipalities /Sewage Directorate
Contract Value: 62,426,727,000 ID
Completion date:December / 2019
Description: The project is located in Al-Mahmodiyah city / Baghdad province with area of (200,000 m2 ) it served about (140,000) people with a capacity of (2,000 m3/hr) . The sewage are processed and turned into irrigation water.
1- Construction of Four Sedimentation basins, & Five Distribution basins.
2- Construction of Two Aeration tanks and Two Thickening basins.
3- Construction of Fifty Drying Basins with Collecting networks.
4- Construction of Pump Station, Chlorine, Electricity Buildings and Inlet Chamber .
5- Construction of Administration, Reception and Storehouse Buildings.
6- Construction of Four Private houses for Project Engineers.
7- Supply and erect the High Voltage ,Low Voltage , Signal Wires and Control network including the overhead and ground cables with total length more than ( 50 Km ).
8- Supply and installation of Five Transformers ( 11/0.4 KV ).
9- Supply and installation of Three Transformers, Fuel tanks, Pumps & Fuel networks.
10- Supply and install Hundreds of Electrical panels ( H.V. & L. V. ) including Distribution Panels , Operating panels ..etc
11- Supply and install all Electrical Wiring, Switches, Feeding Points inside and outside buildings with Road lights, with more than Hundreds of Kilometers.
12- Supply and erect the main Pumps station which contains Nine large pumps with all Pipes and Fittings and Control System.
13- Supply and erect all Mechanical Equipments from SEREKO Company ( Italy ).
14- Supply and construction of Transmission lines with more than ( 40 Km ) ,the Ductile pipes from PAM ( France ) and Others from SAMSUN ( Turkey ).