Jubail Rainwater lift station / 1st stage
Jubail Rainwater lift station / 1st stage
Client: Al-Anbar Province – Falluja / UNDP
Contract Value: 6,300,000 USD
Completion date: December / 2022 (Continued)
Description: Design, Supply, Construct and operate Rainwater lift station
1- Preparing the design package for the whole project activities.
2- Supply and construct Sewage lines inside the plant.
3- Construct the Concrete Collection tank ( 17 m Depth ) with connecting lines.
4- Construct Pump house, Control room, operating room & Administrative building.
5- Supply and Install Pumps, Pipes & fittings for the 1st Stage.
6- Supply and erect the High Voltage network ( 11 KV ) including the overhead and ground cables and Low voltage network.
7- Supply and erect ( 2,500 KVA ) Transformer with High voltage and Low voltage panels.
8- Supply and erect ( 2 x 1,250 KVA ) Electrical Generators , Fuel Tank, Pump , Filter & Instruments .. etc.
9- Supply and erect Overhead Cranes as per the project design.
10- Construct Roads, Walkways & Yards.
11- Supply and Install all Instruments Electrical machines.