Construction of Five Hydraulic Gates and Three Concrete Bridges on Al-Furat River
Construction of Five Hydraulic Gates and Three Concrete Bridges on Al-Furat River
Client: Ministry of Water Resources/ Center for Restoration of Iraqi Marshes and wetlands
Contract Value: 17,312,028,010 ID
Completion date: September / 2012
Description: The project includes achieving of Five Hydraulic Gates ( Water Regulators ) to maintain water levels in the marshes and construction of Three Concrete bridges (two lanes for each).
1- Site preparation and construct Alternative roads.
2- Supply and install concrete piles ( more than 100 piles ) with all tests.
3- Supply and execute Ground leveling and execute all Road paving.
4- Supply and cover river shoulders with Stone and concrete.
5- Supply and erect all Pipelines ,Electrical works ,lighting and Steel.
6- Fabricate , install and test Steel gates and Hydraulic system.
7- Construct Three Concrete bridges with two lanes at Al-Khanziri , Al-Sabia’a and Al-Jaaila .
8- Supply and construct tens of Precast concrete structures to be used at the Three bridges.