Al-Dughaima Compact WTU

Al-Dughaima Compact WTU

Client: Al-Anbar Province / Qaim – UNDP
Contract Value: 384,565 USD
Completion date: June / 2022
Description: Rehabilitate of the site , Supply and installation of new Compact unit with 200 m3/hr capacity, the work includes the intake structure & Feeding pipeline.

1- Remove the debris of damaged buildings.
2- Construct Concrete bases for the unit and Trenches.
3- Construct of Control and operating room.
4- Supply and installation of new 200 m3/hr Compact unit, including Settling Tanks, Mixing Tank ,
Sand filters , Pumps, Blower, Chlorine Dosing Unit.

5- Supply and erect the High Voltage network including the overhead and ground cables.
6- Install Steel shades and structure.
7- Supply& erect Raw water line ( 250 mm ) with total length of (150 m).
8- Fix and Maintenance of Intake structure.
9- Supply and erect ( 250 KVA ) Electrical Generator , Fuel Tank, Pump , Filter, Instruments .. etc.
10- Supply and erect the Water network.