Scientific Department Buildings and the Dormitory Building at Al-Anbar University / Faculty of Education in Al-Qaim
Scientific Department Buildings and the Dormitory Building at Al-Anbar University / Faculty of Education in Al-Qaim
Client: Reconstruction Fund for Areas Affected by Terrorist Operations
Contract Value: 4,681,738,000 ID
Completion date: May 2023
Description: Demolition and reconstruction of buildings damaged as a result of military operations and damage caused by the terrorist organization ISIS in these buildings and includes.
1- Demolition of all damaged buildings and Removal of debris and transporting them out of the site.
2- Construction work for the Scientific Departments buildings with an area of about ( 5,000 m2 ) with several floors.
3- Construction work for the Dormitory buildings with an area of about ( 3,000 m2 ) with several floors.
4- Supply and install Fire detection system and Fire extinguishers.
5- Supply and install Generators of different sizes , Power panels and Fuel tanks.
6- Supply and install different A/C units , AHU , ( 17 ) of VRV systems , (100) Split units and Piping & Ducts works.
7- Supply and install Electric Elevators of different capacities.
8- Supply and install dozens of Electrical panels, including distribution and operation panels for Air conditioning Equipments and for all project buildings units.
9- Supply and install a multi-kilometers network of Power and Control Cables.
10- Supply and install of Electrical points and lights (more than 2,500 points installations) .